|
|
Line 1: |
Line 1: |
| * 29.11.2010: Hardware of phase1 step 0 (installation step 0) was delivered
| | is removed |
| * 30.11.2010: Power on for step 0
| |
| * 02.12.2010: internal users and HWW environment for testing installed
| |
| * 10.12.2010: online documentation available
| |
| * 17.12.2010: internal training
| |
| * 21.12.2010: Final User Management configuration
| |
| * 27.12.2010: December Programming Environment Release installed
| |
| * 07.01.2011: Security Patches FN #5740 and FN#5752 installed
| |
| * 24.02.2011: Security Patches FN #5760
| |
| * 24.02.2011: February Programming Environment Release installed
| |
| * 23.03.2011: March Programming Environment Release installed
| |
| * 07.04.2011: Update to CLE 3.1.UP03
| |
| * 25.07.2011: Update to CLE 4.0 UP00 and SMW Upgrade
| |
| | |
| * 27.09.2011: Hardware delivery of installation step 1
| |
| * 28.09.2011: Final shutdown of step 0 for integration into step 1
| |
| * 04.10.2011: Power on for step 1
| |
| * 31.10.2011: Ready for use of step 1
| |
| * 29.11.2011: Stability test of step 1 starts; accessible for users
| |
| * 29.12.2011: System accepted and now in production; torque downgrade to version 2.5.9; security updates
| |
| * 12.01.2012: Lustre LNET reconfiguration for external access; Network firmware update.
| |
| * 13.02.2012: Emergency Maintenance (2 service nodes down, minor bug fixes)
| |
| * 06.03.2012: Replacement of all blowers and VRM's of service blades
| |
| * 03.04.2012: BlueArc redundant controler installed; Update to CLE 4.0.UP02; security patches, firmware updates; patches for ccm and RSIP installed
| |
| * 04.04.2012: Emergency Maintenance: BlueArc failed
| |
| * 07.05.2012: Power blackout on campus
| |
| * 15.05.2012: Emergency maintenance: sdb crashed
| |
| * 29.05.2012: Update SMW 6.0.UP03 and CLE 4.0.UP03, CLE patches PS29A, general defect hardware replacements, FCO 4120
| |
| * 03.06.2012: System crashed due to backplane error
| |